Indian IPO Blog: NTPC FPO Price
Showing posts with label NTPC FPO Price. Show all posts
Showing posts with label NTPC FPO Price. Show all posts

Wednesday, February 3, 2010

NTPC FPO Price Range

February 03, 2010 0
NTPC FPO Price Range
NTPC FPO consists of 412,273,220 Equity Shares of Rs.10/- each at prices to be determined through an alternative book building process. In this case, there is no price band is fixed as is generally done in case of a Public Offer. Instead, in this kind of issue, a Floor Price is declared. The Floor Price for the NTPC FPO is fixed at Rs.201/- per equity share. The Bid Lot is 28 Equity Shares and in multiples thereof

Thus, for Retail Category, HNI Category and Reserve Category, Price would be the Floor price, i.e. Rs. 201/-, whereas for QIB category, Price would be any price above floor price

National Thermal Power Corporation Limited (NTPC) is the largest power generating company in India. It has emerged as an ‘Integrated Power Major’, with presence in the entire value chain of power generation business. Apart from power generation, which is the mainstay of the company, NTPC has already ventured into consultancy, power trading, ash utilization and coal mining

NTPC FPO Bid Lot

February 03, 2010 0
NTPC FPO Bid Lot
The Floor Price for the upcoming Follow-on Public Offer (FPO) of National Thermal Power Corporation (NTPC) Limited, the largest power generation company in India, is fixed at Rs.201/- per equity share. The bid lot is 28 equity shares and in multiples thereof

The FPO would consist of 412,273,220 equity shares of Rs 10 each at prices to be determined through an alternative book building process

Click here for more on NTPC FPO!

Tuesday, February 2, 2010

NTPC FPO Floor Price Fixed

February 02, 2010 0
NTPC FPO Floor Price Fixed
The Floor Price for the upcoming Follow-on Public Offer (FPO) of National Thermal Power Corporation (NTPC) Limited, the largest power generation company in India, is fixed at Rs.201/- per equity share. The FPO would consist of 412,273,220 equity shares of Rs 10 each at prices to be determined through an alternative book building process. Out of the above, a total of 4,273,220 equity shares are reserved for NTPC employees

NTPC was set up in 1975 to accelerate power development in India. Apart from power generation, which is the mainstay of the company, NTPC has already ventured into consultancy, power trading, ash utilisation and coal mining.

NTPC had come up with an IPO between October 7, 2004 and October 14, 2004. At the time of NTPC Initial Public Offer (IPO), the shares were offered in a price band of Rs.52/- to Rs.62/- per equity share and the issue price was fixed at the upper end of the price band, i.e. at Rs.62/- per equity share

NTPC IPO, in 2004, had received good response from both the Retail and the Institutional Investors. NTPC IPO was subscribed by around 24 times on an overall basis. Retail Category had also received good response with the Category getting subscribed about 4 times